Value 01 · Speed

Speed within CTO+

Fast cleanroom delivery without compromising performance or compliance. Proven ADAPTUS building blocks give you faster installation, predictable timelines and consistent quality.

8–12

weeks typical delivery

Up to50%

shorter than traditional projects

Video

From signature to start-up in weeks, not months

Follow a CTO+ project from contract to a running cleanroom. See how pre-engineered ADAPTUS building blocks and parallel configuration bring delivery down to 8 to 12 weeks.

Video: Speed within CTO+

From Engineer-to-Order to Configure-to-Order

The traditional approach

Engineer-to-Order

Every project is a unique design, like building a custom facility from scratch. Slow, resource-heavy and prone to delays.

Our solution

Speed through validated building blocks

Configure-to-Order uses standardised, pre-engineered and validated building blocks. Timelines shrink while performance, compliance and flexibility stay intact. No redesign, no repeated engineering.

How we deliver speed

01

Standardised building blocks

A predefined portfolio of ADAPTUS modules with proven design logic and validated data cuts engineering time and improves every next project.

02

Parallel configuration

Configuration and engineering run side by side. With key materials in stock, execution starts as soon as the configuration is approved.

03

Right the first time

Standard components and clear interfaces simplify installation, limit errors and prevent rework or late design changes.

Your competitive advantage

AdvantageMechanismImpact
Faster time-to-marketPre-engineered modulesDelivery up to 50% shorter than traditional projects (8 to 12 weeks)
Simplified validationProven, tested componentsFaster CQV and less risk of rework during commissioning and validation
Ability to expandModular building blocksFuture expansion without redesign, protecting your investment
Product families

Choose your configuration

6 to 8 weeks

ICONIC

Entry-level cleanroom for a wide range of applications.

10 to 15 weeks

INTEGRA

Off-the-shelf modular cleanroom meeting ISO and cGMP standards through the integrated VIX concept.

12 to 16 weeks

STERICUBE ONE

Modular outdoor cleanroom unit for sites with limited indoor space.

4 to 6 weeks

SOFTCUBE

Freestanding, mobile filtration unit with PVC curtain or rigid PVC panel walls.

Design tool

Start drawing

Compare alternatives, draw your cleanroom and watch the indicative budget while you build. Send the design when you are ready.

Free estimate

Start your cleanroom project

Share specifications, location and timing in three short steps. You receive a first cost estimate within one working day.

Frequently asked questions

Building with pre-engineered, validated modules instead of designing from scratch. That reduces engineering time, risk and lead time.

Engineer-to-Order designs every project from zero, with long engineering and unpredictable timelines. Configure-to-Order uses standard modules, allowing parallel engineering and predictable delivery.

Typically in 8 to 12 weeks, depending on scope and configuration. Often up to 50% faster than traditional approaches.

Yes. Validated components simplify commissioning, qualification and validation while supporting compliance.

Yes. It is modular, so extra capacity, zones or layout changes use the same building blocks.

Industries that value speed, predictability and compliance: pharmaceuticals, biotechnology, cell and gene therapy, medical devices and advanced semiconductor manufacturing.

Yes. Tested, repeatable building blocks reduce design and execution risk, rework, delays and unexpected changes.

Yes. It standardises the building blocks while keeping the configuration flexible for process, performance and compliance needs.