Value 03 · Budget

Budget within CTO+

The price you control. Configure-to-Order+ fixes the price upfront and keeps hidden costs out of your project.

CAPEX

defined by configuration

OPEX

lowered by VIX

TCO

optimised over the lifetime

Video

Know your price before the first module ships

See how configuration fixes your price upfront. You pay only for the functions you need, while the VIX concept keeps operating costs low for the lifetime of your cleanroom.

Video: Budget control within CTO+
The problem

Custom-built cleanrooms carry financial risk

When every cleanroom is engineered from scratch, cost is only known at the end. Design changes and late discoveries force re-engineering, and the budget follows.

Inflated investment from over-engineering
Limited budget flexibility
Cost overruns from re-engineering during execution
Our solution

Price is managed by configuration

A value-engineered approach puts you in control of cost from the first configuration.

Guaranteed cost control

ADAPTUS building blocks mean you only pay for the functions you need.

Optimised lifetime cost

Lower complexity reduces total cost of ownership, energy use and operating costs.

Reduced construction time

Faster on-site installation lowers project management costs.

Your competitive advantage

AdvantageMechanismImpact
Guaranteed CAPEX controlValue engineering and the ADAPTUS platformPricing is defined by the selected components and scope
Lowest OPEXPatented, decentralised VIX systemBetter energy efficiency and dynamic night setback
Product families

Choose your configuration

6 to 8 weeks

ICONIC

Entry-level cleanroom for a wide range of applications.

10 to 15 weeks

INTEGRA

Off-the-shelf modular cleanroom meeting ISO and cGMP standards through the integrated VIX concept.

4 to 6 weeks

SOFTCUBE

Freestanding, mobile filtration unit with PVC curtain or rigid PVC panel walls.

Design tool

Start drawing

Compare alternatives, draw your cleanroom and watch the indicative budget while you build. Send the design when you are ready.

Free estimate

Start your cleanroom project

Share specifications, location and timing in three short steps. You receive a first cost estimate within one working day.

Frequently asked questions

Scope, components and performance are set at the start through Configure-to-Order. The price is fixed early and adjusted through configuration, not through later redesign.

Standard, pre-engineered building blocks have known costs and performance. Because the cleanroom is configured rather than designed from scratch, the price can be set upfront and stays stable.

Each custom cleanroom is engineered uniquely. Design changes, coordination issues and late discoveries force re-engineering, which drives up cost.

Including only the functions needed to meet performance and compliance requirements, and leaving out features that raise the investment without adding operational value.

Fewer design uncertainties, fewer late changes and more predictable construction and operation lower the risk of overruns and unexpected operating costs.

The upfront investment plus energy, maintenance and operating costs over the lifetime. A configured design reduces complexity and energy demand, which lowers TCO.

Yes. Shorter installation cuts project management, labour and coordination costs.